CURT 58445 Long-Lead Mini Fuse Bypass Switch for RV Dinghy Towing
This long-lead mini fuse bypass switch helps avoid having to remove and replace fuses when flat towing your vehicle. It is designed for vehicle-specific application and integrates with CURT RV harnesses for a custom-fit solution. It includes a bypass harness, fuse holder and other components.
  • Long-Lead Mini Fuse Bypass Switch
  • Helps avoid having to remove and replace fuses when flat towing your vehicle
  • Vehicle-specific application for a custom fit
  • Integrates with CURT RV harness (sold separately)
  • Includes bypass harness, fuse holder and other components
  • Fuse not included
  • 20-amp max
  • One-year warranty

Information:

One-year warranty

Application Summary:

Year Make/Model
2010-2011 Cadillac SRX
2008 Chevrolet Equinox
2014-2015 Chevrolet Malibu
2003 Chevrolet Tracker
2007-2020 Ford Edge
2001-2020 Ford Escape
2007-2011 Ford Explorer
2009-2019 Ford Flex
2006-2020 Ford Fusion
2003 GMC Safari
1997-2014 Honda CR-V
2009-2014 Honda Fit
2009-2012 Honda Pilot
1998 Jeep Wrangler
2009 Lexus RX350
2005 Pontiac G6
2007-2010 Pontiac G6
2007-2009 Saturn Aura
2008-2010 Saturn Vue
2008 Subaru Legacy
Attributes
California Proposition 65 WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
Class ID 11, 11
Container Volume Cubic Feet - XA 0.00000
Container Volume Cubic Meter - XA 0.00000
Country of Origin (Primary) TW
Finish BLACK RUBBER
Finish - XA BLACK RUBBER, BLACK RUBBER
Harmonized Tariff Code (Schedule B) 8536509065
Hazardous Material Code N
Item Class - XA CME, CME
Item Height - XA 0.000, 0.000
Item Length - XA 0.000, 0.000
Item Width - XA 0.000, 0.000
Life Cycle Status Code Available to Order
Master Case Height Inches - XA 0.000, 0.000
Master Case Length Inches - XA 0.000, 0.000
Master Case Volume Cubic Feet - XA 0.00000, 0.00000
Master Case Weight Lbs - XA 0.000, 0.000
Master Case Width Inches - XA 0.000, 0.000
Material - XA THERMOPLASTIC RUBBER, THERMOPLASTIC RUBBER
Mount Type Description - XA Not Applicable, Not Applicable
NAFTA Preference Criterion Code B
Pallet Qty - XA 0.000, 0.000
Pallet Total Height Inches - XA 0.000, 0.000
Pallet Total Weight Per - XA 0.000, 0.000
Parcel Allowed - XA Yes, Yes
Price Code - XA E15, E15
Product Weight - XA 0.000, 0.000
Rate Class - XA 65.0, 70.0
Retail Height - XA 2.000, 2.000
Retail Length - XA 9.000, 9.000
Retail Width - XA 4.000, 4.000
Sales Family Code - XA ELECT, ELECT
Sales Family Description - XA ELECTRICAL COMPONENTS, ELECTRICAL COMPONENTS
Sales Group Description - XA RV HARNESS, RV HARNESS
SDR Required Flag N
Shipping Weight - XA 0.170, 1.000
Side Application Type Description - XA Not Applicable, Not Applicable
Tariff 301 - XA No, No
Truckload Volume Cubic Feet - XA 0.00000, 0.00000
Warranty One-Year Limited Warranty, One-Year Limited Warranty
GTIN 00612314584451

Write a review.

Note: HTML is not translated.
    Bad           Good

Tags: bipass tow bar accessories camper hitch leads panel wired auto stop car replacement parts fit electric accessory truck wiring flex atm socket connector power supply mode driving towed vehicles close system rv designs switches disconnect control